Uploads by Newmantjn

Jump to navigation Jump to search

This special page shows all uploaded files.

File list
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size Description Versions
15:31, 17 November 2011 FinishedOnOff.jpg (file) 216 KB The completed installation of the new on/off switch. 1
15:29, 17 November 2011 CableDone.jpg (file) 255 KB This file show the lacing. You could also zip tie it. 1
15:27, 17 November 2011 Laceing.jpg (file) 170 KB Completed Lacing of the On/Off wiring. 1
15:21, 17 November 2011 CabDone.jpg (file) 127 KB Finished cabinet, as viewed from the bottom. Ready for switch installation. 1
15:20, 17 November 2011 HoleSawTop.jpg (file) 247 KB Hole saw started from the top. Go half way and then finish from the bottom. 1
15:18, 17 November 2011 ScrewBlock.jpg (file) 183 KB Block installed and with a large screw through the middle of it to hold it overnight until the glue dries. 1
15:16, 17 November 2011 GlueBlock.jpg (file) 159 KB Block with glue smeared on it and a pilot hole for the clamping screw drilled into it. 1
15:13, 17 November 2011 BlockCutandMark.jpg (file) 166 KB A 3" x 5" block of birch plywood, cut and with the center marked. 1
15:02, 17 November 2011 HookUpSwitch2.jpg (file) 250 KB The splice on the black wire is almost complete. Just need to slide over the shrink tube and heat it up. 1
14:56, 17 November 2011 RedtoBlacktoBlack.jpg (file) 171 KB Wiring of the new switch. The smaller black and red wires, just to the left of the shrink tubing were pulled off the hold relay and soldered together and also to the larger (14 ga.) single black wire coming out of the splice to the right. The lower, lar 1
14:29, 17 November 2011 PowerCordHookUp.jpg (file) 225 KB The hook up for a two pronged, polarized line cord. Note that the ribbed side goes to the transformer. 1
14:25, 17 November 2011 StartingPoint.jpg (file) 232 KB A typical power cord which requires replacing 1
20:45, 25 May 2011 Coil Sleeves.pdf (file) 7 KB What fits what coil sleeve chart 1
13:07, 23 May 2011 RatTrapScoreWheelAssy.jpg (file) 1.34 MB Install the Score Reel 1
13:04, 23 May 2011 RatTrapCircuitBoardAssy.jpg (file) 1.29 MB Install the Circuit Board 1
13:00, 23 May 2011 RatTrapCoilandPlungerAssy.jpg (file) 1.4 MB Assemble the Plunger and Coil 1
12:55, 23 May 2011 RatTrapRatchetandCamAssy.jpg (file) 1.5 MB 3.Install the Cam and Ratchet Hub 1
12:54, 23 May 2011 RatTrapDriveIndexPawlAssembly2.jpg (file) 1.36 MB Install the Drive Index Pawl Assembly, spring and E clip 1
12:50, 23 May 2011 RatTrapStepUpPawlInstall.jpg (file) 1.43 MB Install the Stepup Pawl 1
08:56, 15 May 2011 RatTrapMoreSwitches.jpg (file) 1.85 MB Some Score Reels Have More Switches than Others 1
08:50, 15 May 2011 RatTrapCoilStopReplacement.jpg (file) 1.12 MB Replacing the Coil Stop 1
08:47, 15 May 2011 RatTrapCoilNewParts.jpg (file) 687 KB Replacement Parts for the Coil and Plunger 1
08:42, 15 May 2011 RatTrapCleanInsideReel.jpg (file) 1.23 MB Clean the Inside with Novus or a Rag Moistened with Mean Green 1
08:37, 15 May 2011 RatTrapReelCleaning.jpg (file) 1.34 MB Clean the Number Surface with Novus 2 1
08:31, 15 May 2011 RatTrapReelCleaningSupplies 033.jpg (file) 1.14 MB Cleaning Supplies Used for Score Reels 1
08:27, 15 May 2011 RatTrapUltrasonic.jpg (file) 1.44 MB Parts in the Harbor Freight Ultrasonic Cleaner 1
08:24, 15 May 2011 RatTrapBottleBrush1.jpg (file) 1.14 MB Clean out the Holes with a Bottle Brush 1
08:22, 15 May 2011 RatTrapMeanGreen.jpg (file) 1.33 MB Hose the parts down with Mean Green 1
07:57, 13 May 2011 RatTrapTeflon.jpg (file) 1.23 MB Use Superlube or a Similar Dielectric Grease - Use Sparingly 1
07:55, 13 May 2011 RatTrapAfterSanding.jpg (file) 1.19 MB Circuit Board After Light Sanding 1
07:54, 13 May 2011 RatTrap600Grit.jpg (file) 1.37 MB Sand with 600 Wet or Dry and Alcohol 1
07:45, 13 May 2011 RatTrapCircuitBoardInitialClean.jpg (file) 1.54 MB Initial Cleaning Done with Synthetic Steel Wool and Mean Green 1
09:11, 11 May 2011 RatTrapStripped.jpg (file) 1,008 KB Rat Trap Score Reel Assembly, Fully Stripped 1
08:42, 11 May 2011 RatTrapRachetandPawl2.jpg (file) 1.24 MB Ratchet and Pawl Removal 1
08:22, 11 May 2011 RatTrapStepUp.jpg (file) 1.28 MB Step Up Pawl removed. 1
08:14, 11 May 2011 RatTrapCoilParts.jpg (file) 907 KB Used parts from the coil assembly. Remove the coil by unscrewing the two screws holding the coil stop on. 1
20:13, 10 May 2011 RatTrapBoardAway.jpg (file) 1.16 MB Swing Board out of the way 1
20:12, 10 May 2011 RatTrapDesolder.jpg (file) 1.17 MB Desolder the wire to enable the board to swing out of the way. 1
20:10, 10 May 2011 RatTrapCircuitBoardRemoval.jpg (file) 1.21 MB Remove the two bottom screws 1
20:03, 10 May 2011 RatTrapCamandEclip.jpg (file) 1.27 MB Remove the E clip that retains the Cam and Ratchet Hub Assembly 1
18:20, 10 May 2011 RatTrapRemoval.JPG (file) 1.06 MB Score Reel Assembly Removal 1
18:18, 10 May 2011 RatTrapScrews.jpg (file) 949 KB Score Reel Removal 1
18:11, 10 May 2011 RatTrapGroundWheelPokaYoke.jpg (file) 1.49 MB Poka-Yoke assembly feature on the ground wheel 1
18:06, 10 May 2011 RatTrapGroundWheelAssy.jpg (file) 1.62 MB The Grounding Wheel Assembly 1
17:57, 10 May 2011 RatTrapLovinIt.jpg (file) 848 KB The Iconic Rat Trap Score Reel. Where engineering and art intersect. 1
17:55, 10 May 2011 RatTrapAfterDegrease.jpg (file) 1.01 MB Circuit Board After Mean Grean Degreasing 1
20:17, 28 April 2011 Volleydrop014.jpg (file) 1.22 MB All Done 1
20:16, 28 April 2011 Volleydrop012.jpg (file) 1.39 MB Back on 1
20:15, 28 April 2011 Volleydrop011.jpg (file) 1.51 MB Another Shot of the Reset Arm Installation 1
20:11, 28 April 2011 Volleydrop010.jpg (file) 1.37 MB Reset Arm Installed 1
First pagePrevious pageNext pageLast page